Flashing As Siding

Siding Transitions Vertical Siding Vertical Siding Exterior House Cladding

Siding Transitions Vertical Siding Vertical Siding Exterior House Cladding

Pin On Construction

Pin On Construction

Pin On Diy Repairs

Pin On Diy Repairs

Pin On Wood

Pin On Wood

Pin On Roof

Pin On Roof

Vinyl Siding Tips Vinyl Siding Vinyl Siding Installation Installing Siding

Vinyl Siding Tips Vinyl Siding Vinyl Siding Installation Installing Siding

Vinyl Siding Tips Vinyl Siding Vinyl Siding Installation Installing Siding

It requires no nails.

Flashing as siding.

Where the step flashing terminates along a sidewall is a common trouble spot for moisture problems. Use a felt paper spline wrapped around the corner and extending 6 inches beyond the corner board to protect the joints where the siding meets the corner boards see figure 1 5 at left. It is used to protect the horizontal joints between sheets of siding from water infiltration. Otherwise dripping water will leave its mark along the siding.

The following series of pictures will detail how to make a simple flashing that can be slid up behind the joint. Even if the roof has been properly flashed against the sidewall this one hasn t water can still run down the side of the house and behind the siding causing rot. The solution to rotting sidewalls is a small piece of bent metal called a kickout flashing at roofing suppliers which simply directs all that water away from the wall. Galvanized z flashing so called because of its z shaped profile keeps water from getting through horizontal joints between sheets of plywood siding.

Position the flashing lengths as defined in step 2 overlapping the ends a minimum of 2 inches onto the previous flashing piece and securing the flashing with 8d nails at each wall stud. Flashing between brick and siding is a relatively similar process on all types of brick to siding transitions although there may be slight variations based on manufacturer recommendations. Failed caulk joint with no flashing behind. You set flashing upon top edge of each piece of plywood over a fat bead of caulk and hold it in place with just heads of roofing nails driven into sheathing.

Continue installing the z flashing at the top edge of the siding panels across the full length of wall. Siding is the first line of defense against water intrusion and the multitude of problems it causes including the dreaded mold. The best solution is a preformed or custom bent kick out flashing to divert the water away from the siding. The seat dimension 3 8 in corresponds to the siding thickness.

The caulk has failed and water can find its way behind the siding. The large leg of the metal goes against the wall leaving the seat and face covering the top edge of the siding. With the flashing in place let s see what happens. The water then runs off the flashing because it can t go up the flashing as it extends up behind the siding.

The water runs down the siding and at the bottom of the first row of vinyl siding it drips off and contacts the metal flashing as it runs across the top of the fascia board. Galvanized steel z flashing is made from 28 gauge galvanized steel.

Cedar Siding General Installation Tips Real Cedar Cedar Siding Installing Siding Installing Cedar Siding

Cedar Siding General Installation Tips Real Cedar Cedar Siding Installing Siding Installing Cedar Siding

This Illustration Shows The Correct Way To Detail The Transition Between Dissimilar Cladding Types A Flas Exterior Cladding Cladding Installing Exterior Door

This Illustration Shows The Correct Way To Detail The Transition Between Dissimilar Cladding Types A Flas Exterior Cladding Cladding Installing Exterior Door

Pin On Exterior Projects

Pin On Exterior Projects

Pin On Info With Some How To S

Pin On Info With Some How To S

Source : pinterest.com